Lampiran Surat Direktur Jenderal Pajak

Nomor

:

SE-64/PJ.6/1994

 

CONTOH LAMPIRAN SK. KAKANWIL TENTANG DBKB

  

SK. Kakanwil

:

..................... DJP .....................

Nomor

:

 

Tanggal

:

 

  

DAFTAR BIAYA KOMPONEN BANGUNAN

 

PROPINSI DATI I

:

JAWA BARAT

KAB/KODYA DATI II

:

KODYA BANDUNG

T A H U N

:

1994

 

No.

KOMPONEN
JENIS PENGGUNAAN BANGUNAN

LUAS / TYPE

LANTAI

NILAI (Rp. 000 / M2)

1

2

3

4

5

1.

KOMPONEN UTAMA

 

 

 

 

1.

Perumahan

<  69

1

129

 

 

 

70  -  99

1

165

 

 

 

100  -  149

1

174

 

 

 

150  -  224

1

195

 

 

 

225  -  299

1

227

 

 

 

300  -  449

1

243

 

 

 

450  -  549

1

257

 

 

 

>  550

1

261

 

 

 

 

 

 

 

 

 

<  69

>1

129

 

 

 

70  -  99

>1

174

 

 

 

100  -  149

>1

201

 

 

 

150  -  224

>1

236

 

 

 

225  -  299

>1

276

 

 

 

300  -  449

>1

310

 

 

 

450  -  549

>1

343

 

 

 

>  550

>1

363

 

 

 

 

 

 

 

2.

Kantor, Toko, Apotek, Pasar, Ruko,

<  69

1

129

 

 

Hotel, Restoran, Wisma

70  -  99

1

165

 

 

Penyelenggaraan Pemerintah

100  -  149

1

174

 

 

 

150  -  224

1

195

 

 

 

225  -  299

1

227

 

 

 

300  -  449

1

243

 

 

 

450  -  549

1

257

 

 

 

>  550

1

261

 

 

 

 

 

 

 

 

 

<  69

>1

129

 

 

 

70  -  99

>1

174

 

 

 

100  -  149

>1

201

 

 

 

150  -  224

>1

221

 

 

 

225  -  299

>1

230

 

 

 

300  -  449

>1

246

 

 

 

450  -  549

>1

261

 

 

 

>  550

>1

278

 

 

 

 

 

 

 

3.

Pabrik, Bengkel, Gudang, Olah

<  69

1

103

 

 

Raga/ Rekreasi, Pertanian

70  -  99

1

132

 

 

 

100  -  149

1

139

 

 

 

150  -  224

1

156

 

 

 

225  -  299

1

182

 

 

 

300  -  449

1

194

 

 

 

450  -  549

1

206

 

 

 

>  550

1

209

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

<  69

>1

103

 

 

 

70  -  99

>1

139

 

 

 

100  -  149

>1

161

 

 

 

150  -  224

>1

189

 

 

 

225  -  299

>1

221

 

 

 

300  -  449

>1

248

 

 

 

450  -  549

>1

274

 

 

 

>  550

>1

290

 

 

 

 

 

 

 

4.

Rumah Sakit

<  69

1

155

 

 

 

70  -  99

1

198

 

 

 

100  -  149

1

209

 

 

 

150  -  224

1

234

 

 

 

225  -  299

1

272

 

 

 

300  -  449

1

292

 

 

 

450  -  549

1

308

 

 

 

>  550

1

313

 

 

 

 

 

 

 

 

 

<  69

>1

155

 

 

 

70  -  99

>1

209

 

 

 

100  -  149

>1

241

 

 

 

150  -  224

>1

265

 

 

 

225  -  299

>1

276

 

 

 

300  -  449

>1

295

 

 

 

450  -  549

>1

313

 

 

 

>  550

>1

334

 

2.

KOMPONEN MATERIAL

 

 

 

 

A.

ATAP

 

 

        

 

 

1.

Decrabon, Beton, Glazur

 

 

75

 

 

2.

Genteng Beton

 

 

49

 

 

3.

Genteng Beton

 

 

33

 

 

4.

Asbes

 

 

19

 

 

5.

Seng

 

 

12

 

 

 

 

 

 

 

 

B.

DINDING

 

 

        

 

 

1.

Kaoa Aluminium

 

 

99

 

 

2.

Beton

 

 

33

 

 

3.

Batu Bata, Conblok

 

 

30

 

 

4.

Kayu

 

 

12

 

 

5.

Seng

 

 

9

 

 

 

 

 

 

 

 

C.

LANGIT-LANGIT

 

 

        

 

 

1.

Akustik Jati

 

 

68

 

 

2.

Tripleks, Asbes, Bambu

 

 

23

 

 

 

 

 

 

 

 

D.

LANTAI

 

 

        

 

 

1.

Marmer

 

 

87

 

 

2.

Keramik

 

 

46

 

 

3.

Teraso

 

 

34

 

 

4.

Ubin, PC, Papan

 

 

17

 

 

5.

Semen

 

 

0

 

3.

KOMPONEN FASILITAS

 

 

 

 

A.

AC

 

 

 

 

B.

PEMADAM KEBAKARAN

 

 

160

 

 

1.

Hydrant

 

 

10

 

 

2.

Sprinkler / Fire Alarm

 

 

25

 

C.

KOLAM RENANG

 

 

25000

 

D.

LAIN-LAIN

 

 

        

 

 

1.

Halaman Diperkeras

 

 

35

 

 

2.

Generator Set

 

 

400

 

 

3.

Lift

 

 

140000

 

 

4.

Tangga Berjalan

 

 

130000

 

 

5.

Daya Listrik

 

 

0.20

 

 

 

 

 

 

KEPALA KANTOR WILAYAH VII DJP JAWA BARAT

DIREKTORAT JENDERAL PAJAK,

 

 

 

( .................................................. )

 

 

  

 

 

Lampiran Surat Direktur Jenderal Pajak

Nomor

:

SE-64/PJ.6/1994

 

 

DAFTAR PBB YANG TELAH MENGIRIM LAMPIRAN SK. KAKANWIL

TENTANG DAFTAR BIAYA KOMPONEN BANGUNAN

 

KANWIL

KP. PBB

LAMP. DBKB

KETERANGAN

I

Langsa

Lengkap

 

Pematang Siantar

Lengkap

 

Tebing Tinggi

Lengkap

 

Kisaran

Lengkap

 

Padang Sidempuan

Lengkap

 

Banda Aceh

Lengkap

 

Lhok Seumawe

Lengkap

 

Meulaboh

Lengkap

 

II

Padang

Lengkap

 

Solok

Tidak Lengkap

Beberapa DT. II belum ada

III

-

-

Belum ada KP. PBB yang menyerahkan

VI

-

-

VII

-

-

VIII

-

-

IX

Ngawi

Lengkap

 

Kediri

Tidak Lengkap

Kab. Nganjuk belum ada

X

Sampit

Lengkap

 

Singkawang

Tidak Lengkap

 

XI

Samarinda

Tidak Lengkap

Kab. Kutai belum ada

XII

-

-

Belum ada KP. PBB yang menyerahkan

XIII

Gorontalo

Lengkap

 

XIV

 

Mataram

Lengkap

 

Kupang

Lengkap

 

XV

-

-

Belum ada KP. PBB yang menyerahkan

 

 

  

 

 


 

Lampiran Surat Direktur Jenderal Pajak

Nomor

:

SE-64/PJ.6/1994

 

  

PETUNJUK PENCETAKAN

LAMPIRAN SK. KAKANWIL TENTANG DBKB

DENGAN APLIKASI SISMIOP RILIS 1.0.0.

 

1.

Masuk menu

===>    A. Fungsi Komponen Administrasi Sismiop

2.

Pilih menu

===>    C. Menu Informasi Tabel .....

3.

Pilih menu

===>    A. Melihat DBKB .....

4.

Masukan kode Dati II yang akan dicetak lampiran SK. Kakanwilnya

5.

Jawab "T" untuk melanjutkan proses

6.

Pilih menu

===>    K. Laporan Daftar Biaya Komponen Bangunan

7.

Tekan tombol

===>    F10

8.

Geser kursor ke menu "FILE"

9.

Pilih

===>    CETAK DATA

10.

File keluaran bernama "fetdbkb.prn" pada direktori /u/usr/sismiop/prn

11.

Cetak file tersebut ke printer

12.

Ulangi proses point 4 s/d 12 sejumlah Dati II yang ada di KP. PBB setempat.